Owner: | HS Orka |
Capacity: | 303 Mwe and 200 MWth |
Start of operation: | 130 MW ( 30 MW expansion confirmed 2023) |
Location: | South-west Iceland |
Supply: | Electricity |
Turbines: | 2x50 Fuji Electric |
Wells: | 28 wells ( average depth 2,200 m, 9 wells plugged) |
Reykjanes
The Reykjanes Power Plant is the only seawater-cooled geothermal power plant in the world, and has one of the highest intake pressure to a geothermal turbine.